/

Porsche

Finished

1973 Porsche 911 2.7

A tired US-import 911T with a later 2.7 engine, returned to the road as a sympathetic fast-road car with its original colour.

A tired US-import 911T with a later 2.7 engine, returned to the road as a sympathetic fast-road car with its original colour.

AfterBeforeBeforeAfter

Marque

Porsche

Year

1973

Duration

14 months

Hours

2,140 hrs

Engine

2.7 flat-six, rebuilt

Colour

Light Yellow

The story

A tired US-import 911T with a later 2.7 engine, returned to the road as a sympathetic fast-road car with its original colour.

Full photographic survey and paint depth readings. Found filler in both front wings and the battery boxes.

New front pan, battery boxes, both kidney bowls and inner wings. 312 hours of metalwork.

Engine rebuilt to 2.7 spec, gearbox rebuilt, suspension and brakes refreshed throughout.

“They sent photographs every Friday for fourteen months. When I collected it, it felt like the car I bought, only better.” — Richard, Cheltenham

Work done

  • New front pan and battery boxes
  • Kidney bowls and inner wings replaced
  • Engine rebuilt to 2.7 spec
  • 915 gearbox rebuilt
  • Two-pack Light Yellow, matched from original paint
  • 400 shakedown miles

Build timeline

Week by week, from survey to shakedown

Apr 2025

Apr 2025

Stage 01

Full photographic survey and paint depth readings. Found filler in both front wings and the battery boxes.

Jul 2025

Jul 2025

Stage 02

Stripped to a bare shell and media blasted. Underside rust was worse than expected around the kidney bowls.

Oct 2025

Oct 2025

Stage 03

New front pan, battery boxes, both kidney bowls and inner wings. 312 hours of metalwork.

Dec 2025

Dec 2025

Stage 04

Epoxy primer, seam sealer to factory pattern and two-pack Light Yellow, matched from paint behind the dash.

Mar 2026

Mar 2026

Stage 05

Engine rebuilt to 2.7 spec, gearbox rebuilt, suspension and brakes refreshed throughout.

Jun 2026

Jun 2026

Stage 06

Trim, wiring and glass refitted, then 400 shakedown miles before handover.

Book a visit

Get your free estimate

A specialist calls you back within 30 minutes during opening hours, with a straight answer and a rough price.

We only use your details to reply to you.

Create a free website with Framer, the website builder loved by startups, designers and agencies.